Two FinOps Decisions Not to Confuse
The first question concerns quantity: how much to consume? The second concerns price: at what rate to pay for the consumption that remains durable? These two decisions are linked, but they are not handled with the same levers or at the same time.
A discount applies to a volume. If the volume is poorly calibrated, the discount only accompanies an expense that should not have existed. Buying a discount on a useless resource remains a useless expense. The discount does not make useful what is not; it only reduces its apparent cost.
That is why I prefer to explicitly separate the two stages: first understand and reduce what is consumed, then commit to or negotiate the rate for what remains. This separation is not an accounting formality; it conditions the quality of coverage and the readability of the gain.
First Workstream: Remove, Stop, Adjust, Correct
The first workstream acts on usage itself. Four levers are identified: remove the orphan, schedule shutdown, adjust the size, and correct the architecture.
Removing the orphan consists of removing resources that no longer serve any purpose but continue to be billed. Scheduling shutdown means turning off what does not need to run permanently, for example non-production environments during non-working periods. Adjusting the size, or rightsizing, aligns allocated capacity with actual need. Correcting the architecture changes the very design of the workload so that it consumes less by construction.
These actions have one thing in common: they change the consumption base. They do not merely move the pricing cursor; they reduce the volume to which that cursor will apply. This is precisely what makes them prerequisites to any commitment logic.
Second Workstream: Measure the Stable Base, Then Cover
Once these actions are underway, the question becomes: what remains stable? The second workstream consists of measuring the remaining stable base, then studying Savings Plans, reservations, and commercial agreements.
A commitment is a financial instrument applied to a technical base. Its coverage and expected gain depend directly on the stability of that base. A base that varies greatly is poorly covered with a long commitment; a stable base lends itself better to it. Measuring the base is therefore not an administrative prerequisite; it is the necessary input for sizing.
The proposed order is not an aesthetic preference: it follows from the nature of the object. One cannot correctly calibrate coverage without knowing what is being covered, or over what horizon one can reasonably rely.
The Sequence Is Not an Absolute Order
This is not an absolute order. An existing and underutilized commitment must be managed without waiting. Letting it run without monitoring amounts to paying for coverage that is not used, and this problem is not solved by postponing new purchases.
But buying a new commitment on the basis of usage that one plans to reduce distorts coverage and the expected gain. The nuance is important: it is not about freezing all commitment purchases until the usage workstreams are finished, but about avoiding adding a commitment on a base that one is about to reduce.
In practice, this assumes knowing which reductions are already decided, which are only envisaged, and at what horizon. Without this distinction, coverage may appear correct at the time of purchase and turn out to be oversized a few months later.
Separate Usage Savings from Pricing Advantage
I would always distinguish two things: the usage savings achieved and the pricing advantage. Each has its own comparison basis and date.
Usage savings correspond to the reduction in the quantity consumed, measured against a dated reference. The pricing advantage corresponds to the difference between the non-committed rate and the committed rate, on a given quantity. These are two gains of a different nature, obtained by different means.
Mixing the two makes the result unreadable. One no longer knows whether the gain comes from consuming less or from paying less. Worse, a pricing advantage displayed on a quantity that disappears is not a gain: it relates to a base that no longer exists.
Maintaining a comparison basis and a date for each indicator avoids this pitfall. It also requires owning the stability assumptions retained, and revising them when reality diverges from them.
Practical Questions Before the Next Commitment Purchase
The question asked is simple: are your rightsizing recommendations integrated before your next commitment purchases? It deserves to be broken down into working questions, for guidance and not as a list of prescriptions.
Which usage reductions are already decided, and as of what date? What base is considered stable, over what horizon? How are existing underutilized commitments handled in parallel? What comparison basis and date are retained for usage savings and for pricing advantage? How can the same gain be avoided being counted twice?
These questions do not give a single answer. They serve to make assumptions explicit before committing to a rate. The discipline consists of not buying a discount on a base that one plans to reduce, while managing commitments already in place without delay.